
Sonatrach Group and Italian ENI opened on Thursday a laboratory for solar energy “Solar Lab” and laid the foundation stone of a second photovoltaic solar plant of 10 megawatts in Bir Rbaa Nord in the basin of Berkine (Ouargla).

Sonatrach Group and Italian ENI opened on Thursday a laboratory for solar energy “Solar Lab” and laid the foundation stone of a second photovoltaic solar plant of 10 megawatts in Bir Rbaa Nord in the basin of Berkine (Ouargla).